15.2. Mass Wasting – Vocabulary

Section 15.0 Introduction

  • weather / weathering
  • erode / eroded / erosion
  • mass wasting
  • landslide
  • slope failure
  • gravity
  • mass movement
  • downslope
  • Earth materials
  • unconsolidated
  • consolidated
  • foliation plane
  • snow avalanche
  • material failure
  • Section 15.1 Factors that control slope stability

  • gravitational force
  • vertical
  • horizontal
  • block
  • shear force
  • perpendicular
  • normal force
  • friction
  • shear strength
  • steep / steepness
  • stable / stability
  • unstable
  • strength
  • weak
  • strong
  • planes of weakness
  • orientation
  • weak layer
  • cement / cemented
  • binding
  • cohesion
  • glacial till
  • talus
  • cone
  • water content / moisture content
  • pore space
  • porosity
  • dry
  • moist
  • saturated
  • saturated materials
  • unsaturated materials
  • grain boundary / grain boundaries
  • surface tension
  • grain contact
  • fracture
  • bedding plane
  • clay-bearing zone
  • saturated conditions
  • water pressure
  • hydrostatic pressure
  • water table
  • road cut
  • spring
  • absorb
  • swell
  • slippery
  • trigger
  • water flow pattern
  • dam / dammed
  • runoff
  • slope drainage
  • rainy period

Section 15.2 Classification of mass wasting

  • criterion / criteria
  • material
  • motion
  • fall
  • slide
  • flow
  • coherent
  • incoherent
  • internal motion
  • rupture surface
  • curve / curved
  • rotational slope failure
  • planar
  • translational slope failure
  • rock fall
  • debris fall
  • rock fragment
  • talus slope
  • scree slope
  • angle of repose
  • rock slide
  • parallel
  • sackung
  • catastrophic failure
  • scarp
  • head scarp
  • side scarp
  • drain
  • drainage hole
  • rock bolt
  • steel mesh curtain
  • rock avalanche
  • fluid movement
  • cushion of air
  • creep
  • solifluction
  • loose material
  • lean / leaning
  • pistol butt tree
  • terracettes
  • slump / slumping
  • downward motion
  • outward motion
  • snowmelt runoff
  • toe
  • basal material
  • seasonal stream
  • coulee
  • mud flow
  • debris flow
  • lahar
  • collapse
  • stream bank
  • temporary dam
  • dam burst

Section 15.3 Preventing, delaying, monitoring, and mitigating mass wasting

  • mitigate / mitigation
  • delay
  • damaging effects
  • infrastructure
  • rock bolts
  • drill holes
  • drainage holes
  • retaining wall
  • highway roadcut
  • degradation
  • corrode
  • plug / plugged
  • slope monitoring
  • geological engineer
  • geotechnical engineer
  • preventative measures
  • road surface
  • fill
  • filled slope
  • cut slope
  • natural drainage feature
  • runoff water
  • oversaturation
  • excavation
  • drainage changes
  • lawn irrigation
  • septic system
  • rapid failure
  • monitor / monitoring
  • warning system
  • inclinometer
  • bore-hole motion sensor
  • GPS survey instrument
  • acoustic monitor
  • safe ground
  • avalanche shelter
  • defensive structure
  • drainage basin
  • concrete-lined channel
  • constructed basin

Other vocabulary

  • slope steepening
  • frost wedging
  • liquifaction
  • lubricant
  • regolith
  • permafrost
  • deforestation
  • debris slide
  • tension crevasse
  • joint plane
  • water permeable
  • water impermeable
  • soil saturation
  • re-grade slope
  • undercutting
  • rock netting

License

Icon for the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License

Physical Geology Workbook Copyright © 2019 by Joyce M. McBeth is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License, except where otherwise noted.

Share This Book